F15: Voluntary ex ante transparency notice¶
Quick links: PDF form | sample XML
Release model¶
Add 'award' and 'contract' to
tag
.Set
tender.status
to 'complete'.
What's new¶
If you have already implemented all other forms, this notice adds no new concepts, but inserts one of DIRECTIVE_2014_23_EU
, DIRECTIVE_2014_24_EU
, DIRECTIVE_2014_25_EU
or DIRECTIVE_2009_81_EC
into some of the XML paths.
Other notes¶
The PDF form has radio buttons for the legal basis, which correspond to a single unlabeled XML element (/LEGAL_BASIS
).
Preamble¶
Index | Label and XPath | OCDS guidance |
---|---|---|
Unlabeled |
Lowercase, and map to |
|
Unlabeled |
Discard. TED translates at form-level. OCDS translates at field-level. |
|
Unlabeled |
Set |
|
Unlabeled |
Set |
Section I¶
Index | Label and XPath | OCDS guidance |
---|---|---|
I |
Contracting authority / entity |
|
I.1 |
Name and addresses |
Add a party, and add ‘buyer’ to its Set |
Official name |
Map to the party’s |
|
National registration number |
Map to the party’s |
|
Postal address |
Map to the party’s |
|
Town |
Map to the party’s |
|
NUTS code |
Take the NUTS code in the There’s an open issue (#739) about region codes. Issue |
|
Postal code |
Map to the party’s |
|
Country |
Take the country code in the There’s an open issue (#524) to add a |
|
Contact person |
Map to the party’s |
|
Telephone |
Map to the party’s |
|
E-mail |
Map to the party’s |
|
Fax |
Map to the party’s |
|
Internet address(es) |
||
Main address (URL) |
Map to the party’s |
|
Address of the buyer profile (URL) |
Map to the party’s |
|
I.4 |
Type of the contracting authority (in the case of a notice published by a contracting authority) |
Get the |
Ministry or any other national or federal authority, including their regional or local subdivisions |
Set |
|
National or federal agency / office |
Set |
|
Regional or local authority |
Set |
|
Regional or local agency / office |
Set |
|
Body governed by public law |
Set |
|
European institution / agency or international organisation |
Set |
|
Other type |
Map to |
|
I.5 |
Main activity (in the case of a notice published by a contracting authority) |
Get the |
General public services |
Set |
|
Housing and community amenities |
Set |
|
Defence |
Set |
|
Social protection |
Set |
|
Public order and safety |
Set |
|
Recreation, culture and religion |
Set |
|
Environment |
Set |
|
Education |
Set |
|
Economic and financial affairs |
Set |
|
Health |
Set |
|
Other activity |
Map to |
|
I.6 |
Main activity (in the case of a notice published by a contracting entity) |
Get the (The codes are drawn from Directive 2014/25/EU) |
Production, transport and distribution of gas and heat |
Set (Relates to 2014/25/EU Annex 3, point A) |
|
Railway services |
Set (Relates to 2014/25/EU Annex 3, point D) |
|
Electricity |
Set (Relates to 2014/25/EU Annex 3, point B) |
|
Urban railway, tramway, trolleybus or bus services |
Set (Relates to 2014/25/EU Annex 3, point E) |
|
Extraction of gas and oil |
Set (Relates to 2014/25/EU Annex 3, point G) |
|
Port-related activities |
Set (Relates to 2014/25/EU Annex 3, point I) |
|
Exploration and extraction of coal and other solid fuels |
Set (Relates to 2014/25/EU Annex 3, point H) |
|
Airport-related activities |
Set (Relates to 2014/25/EU Annex 3, point J) |
|
Water |
Set (Relates to 2014/25/EU Annex 3, point C) |
|
Postal services |
Set (Relates to 2014/25/EU Annex 3, point F) |
|
Other activity |
Map to |
Section II¶
Index | Label and XPath | OCDS guidance |
---|---|---|
II |
Object |
|
II.1 |
Scope of the procurement |
|
II.1.1 |
Title |
Map to |
Reference number |
If not set, let Reference number be equal to the |
|
II.1.2 |
Unlabeled |
|
Main CPV code |
Set |
|
Supplementary CPV code |
For each |
|
II.1.3 |
Type of contract |
Set |
Works |
Map to ‘works’ |
|
Supplies |
Map to ‘goods’ |
|
Services |
Map to ‘services’ |
|
II.1.4 |
Short description |
Map to |
II.1.6 |
Information about lots |
|
This contract is divided into lots |
||
yes |
Discard. If |
|
no |
Discard. If |
|
II.1.7 |
Total value of the procurement (excluding VAT) |
|
Value (Please give the total value of the procurement. For information about individual contracts, please use section V) |
Discard. This is derived from the |
|
or |
||
Lowest offer |
Add a bids statistic, set its |
|
Highest offer |
Add a bids statistic, set its |
|
taken into consideration |
||
Currency (for framework agreements – total maximum value for their entire duration) (for contracts based on framework agreements, if required – value of contract(s) not included in previous contract award notices) |
For the Value, discard as above. For the Lowest offer and Highest offer, map to the bid statistic’s |
|
Unlabeled |
||
II.2 |
Description |
Add a F12, F13: Instead, do nothing. |
Unlabeled |
Discard |
|
II.2.1 |
Title |
Map to the lot’s |
Lot No |
If not set, let Lot No be ‘1’. Map to the lot’s |
|
II.2.2 |
Additional CPV code(s) |
|
Main CPV code |
For each F12, F13: Instead, for each |
|
Supplementary CPV code |
For each F12, F13: Instead, for each |
|
II.2.3 |
Place of performance |
|
NUTS code |
For each There’s an open issue (#739) about region codes. Issue |
|
Main site or place of performance |
Map to the item’s |
|
II.2.4 |
Description of the procurement (nature and quantity of works, supplies or services) |
Map to the lot’s F12, F13: Instead, map to |
Unlabeled |
||
Unlabeled |
||
II.2.5 |
Award criteria |
|
Directive 2014/24/EU |
||
Directive 2014/25/EU |
||
Quality criterion |
Add an |
|
Name |
Map to the criterion’s |
|
Weighting |
Map to the criterion’s |
|
Cost criterion |
Add an |
|
Name |
Map to the criterion’s |
|
Weighting |
Map to the criterion’s |
|
Price |
Add an |
|
Weighting |
Map to the criterion’s |
|
Unlabeled |
||
Unlabeled |
||
Unlabeled |
Same as Quality criterion above Add an |
|
Unlabeled |
Add an |
|
Unlabeled |
Add an |
|
Unlabeled |
Map to the criterion’s |
|
Unlabeled |
||
Unlabeled |
||
Directive 2014/23/EU |
||
Criterion (award criteria should be given in descending order of importance) |
Add an |
|
Unlabeled |
||
Unlabeled |
||
Directive 2009/81/EC |
||
Lowest price |
Add an |
|
The most economically advantageous tender in terms of |
||
Criterion |
Add an |
|
Weighting |
Map to the criterion’s |
|
II.2.11 |
Information about options |
|
Options |
||
yes |
Set the lot’s |
|
no |
Set the lot’s |
|
Description of options |
Map to the lot’s |
|
II.2.13 |
Information about European Union funds |
|
The procurement is related to a project and/or programme financed by European Union funds |
||
yes |
In future forms, this field will be de-emphasized. |
|
no |
Discard. If there’s no party with the role ‘funder’ and the name ‘European Union’, then the procurement isn’t related to a project and/or programme financed by European Union funds. |
|
Identification of the project |
||
II.2.14 |
Additional information |
Append to the lot’s This results in a loss of structure. Attention #28 |
Section IV¶
Index | Label and XPath | OCDS guidance |
---|---|---|
IV |
Procedure |
|
Unlabeled |
||
IV.1 |
Description |
|
IV.1.1 |
Type of procedure (please complete Annex D) |
|
Negotiated procedure without prior publication (in accordance with Article 32 of Directive 2014/24/EU) |
Set See Annex D1 |
|
Unlabeled |
||
Negotiated procedure without prior call for competition (in accordance with Article 50 of Directive 2014/25/EU) |
Set See Annex D2 |
|
Unlabeled |
||
Negotiated procedure without publication of a contract notice (in accordance with Article 28 of Directive 2009/81/EC) |
Set See Annex D3 |
|
Unlabeled |
||
Award of a concession without prior publication of a concession notice (in accordance with Article 31(4) and (5) of Directive 2014/23/EU) |
Set See Annex D4 |
|
Award of a contract without prior publication of a call for competition in the Official Journal of the European Union in the cases listed below (please complete point 2 of the Annex D) |
Set See Annex D |
|
Unlabeled |
Set See Annex D |
|
Unlabeled |
Set See Annex D |
|
Unlabeled |
Set See Annex D |
|
IV.1.3 |
Information about framework agreement |
|
The procurement involves the establishment of a framework agreement |
Set |
|
IV.1.8 |
Information about the Government Procurement Agreement (GPA) |
|
The procurement is covered by the Government Procurement Agreement |
||
yes |
Add ‘GPA’ to the |
|
no |
Discard. If ‘GPA’ isn’t in the |
|
IV.2 |
Administrative information |
|
IV.2.1 |
Previous publication concerning this procedure |
|
Notice number in the OJ S |
Section V¶
Index | Label and XPath | OCDS guidance |
---|---|---|
V |
Award of contract / concession |
Add an |
Unlabeled |
Discard |
|
Contract No |
If not set, let Contract No be the notice number followed by a hyphen ‘-‘ followed by the value of the This assumes the Contract No is unique within the contracting process. Attention #93 |
|
Lot No |
If not set, let Lot No be ‘1’. Add to the award’s |
|
Title |
Map to the award’s |
|
V.2 |
Award of contract / concession |
Set the award’s Add a |
V.2.1 |
Date of the award decision of the contract / concession (dd/mm/yyyy) |
Map to the contract’s |
Information about tenders |
||
The contract has been awarded to a group of economic operators |
||
yes |
Discard. If there are multiple suppliers, then the contract has been awarded to a group of economic operators. |
|
no |
Discard. If there is one supplier, then the contract hasn’t been awarded to a group of economic operators. |
|
Unlabeled |
||
V.2.3 |
Name and address of the contractor/concessionaire |
Add a party, and add ‘supplier’ to its Add an |
Official name |
Map to the party’s |
|
National registration number |
Same as National registration number above Map to the party’s |
|
Postal address |
Map to the party’s |
|
Town |
Map to the party’s |
|
NUTS code |
Take the NUTS code in the There’s an open issue (#739) about region codes. Issue |
|
Postal code |
Map to the party’s |
|
Country |
Take the country code in the There’s an open issue (#524) to add a |
|
E-mail |
Map to the party’s |
|
Telephone |
Map to the party’s |
|
Internet address (URL) |
Map to the party’s |
|
Fax |
Map to the party’s |
|
The contractor / concessionaire will be an SME |
||
yes |
Set the party’s |
|
no (SME – as defined in Commission Recommendation 2003/361/EC) |
Set the party’s |
|
V.2.4 |
Information on value of the contract/lot/concession (excluding VAT) |
|
Initial estimated total value of the contract/lot/concession |
Discard. The Initial estimated total value of the contract/lot is available in the OCDS release with the same |
|
Total value of the contract / lot / concession |
Map to the contract’s |
|
or |
||
Lowest offer |
Add a bids statistic, set its |
|
Highest offer |
Add a bids statistic, set its |
|
taken into consideration |
||
Currency (for framework agreements – total maximum value for this lot) (for contracts based on framework agreements, if required – value of contract(s) for this lot not included in previous contract award notices) |
For the Initial estimated total value of the contract/lot, discard as above. For the Total value of the contract/lot, map to the contract’s For the Lowest offer and Highest offer, map to the bid statistic’s |
|
Unlabeled |
||
V.2.5 |
Information about subcontracting |
|
The contract / lot / concession is likely to be subcontracted |
Set the award’s |
|
Value or proportion likely to be subcontracted to third parties |
||
Value excluding VAT |
Map to the award’s |
|
Currency |
Map to the award’s |
|
Proportion |
Map to the award’s |
|
Short description of the part of the contract to be subcontracted (Only in the case of a notice covered by Directive 2009/81/EC) |
Map to the award’s |
|
Unlabeled |
||
All or certain subcontracts will be awarded through a competitive procedure (see Title III of Directive 2009/81/EC) |
Set the award’s |
|
A share of the contract will be subcontracted through a competitive procedure (see Title III of Directive 2009/81/EC) |
||
Minimum percentage |
Map to the award’s |
|
Maximum percentage (The maximum percentage may not exceed 30 % of the value of the contract) |
Map to the award’s |
Section VI¶
Index | Label and XPath | OCDS guidance |
---|---|---|
VI |
Complementary information |
|
VI.3 |
Additional information |
Map to the release’s |
VI.4 |
Procedures for review |
|
VI.4.1 |
Review body |
Add a party, and add ‘reviewBody’ to its |
Official name |
Map to the party’s |
|
Postal address |
Map to the party’s |
|
Town |
Map to the party’s |
|
Postal code |
Map to the party’s |
|
Country |
Take the country code in the There’s an open issue (#524) to add a |
|
E-mail |
Map to the party’s |
|
Telephone |
Map to the party’s |
|
Internet address (URL) |
Map to the party’s |
|
Fax |
Map to the party’s |
|
VI.4.2 |
Body responsible for mediation procedures |
Add a party, and add ‘mediationBody’ to its |
Official name |
Map to the party’s |
|
Postal address |
Map to the party’s |
|
Town |
Map to the party’s |
|
Postal code |
Map to the party’s |
|
Country |
Take the country code in the There’s an open issue (#524) to add a |
|
|
Map to the party’s |
|
Telephone |
Map to the party’s |
|
Internet address (URL) |
Same as Internet address above Map to the party’s |
|
Fax |
Map to the party’s |
|
VI.4.3 |
Review procedure |
|
Precise information on deadline(s) for review procedures |
Map to |
|
VI.4.4 |
Service from which information about the review procedure may be obtained |
Add a party, and add ‘reviewContactPoint’ to its |
Official name |
Map to the party’s |
|
Postal address |
Map to the party’s |
|
Town |
Map to the party’s |
|
Postal code |
Map to the party’s |
|
Country |
Take the country code in the There’s an open issue (#524) to add a |
|
|
Map to the party’s |
|
Telephone |
Map to the party’s |
|
Internet address (URL) |
Same as Internet address above Map to the party’s |
|
Fax |
Map to the party’s |
|
VI.5 |
Date of dispatch of this notice (dd/mm/yyyy) |
Map to |
Annex D1 – General procurement¶
Index | Label and XPath | OCDS guidance |
---|---|---|
Justification for the award of the contract without prior publication of a call for competition in the Official Journal of the European Union |
||
Directive 2014/24/EU (please select the relevant option and provide an explanation) |
||
D1.1 |
Justification for the choice of the negotiated procedure without prior publication of a call for competition in accordance with Article 32 of Directive 2014/24/EU |
For each of the following, add a |
No tenders or no suitable tenders / requests to participate in response to |
||
open procedure |
Set |
|
restricted procedure |
Set |
|
The products involved are manufactured purely for the purpose of research, experiment, study or development under the conditions stated in the directive (for supplies only) |
Set |
|
The works, supplies or services can be provided only by a particular economic operator for the following reason |
||
absence of competition for technical reasons |
Set |
|
procurement aiming at the creation or acquisition of a unique work of art or artistic performance |
Set |
|
protection of exclusive rights, including intellectual property rights |
Set |
|
Extreme urgency brought about by events unforeseeable for the contracting authority and in accordance with the strict conditions stated in the directive |
Set |
|
Additional deliveries by the original supplier ordered under the strict conditions stated in the directive |
Set |
|
New works / services, constituting a repetition of existing works / services and ordered in accordance with the strict conditions stated in the directive |
Set |
|
Service contract to be awarded to the winner or one of winners under the rules of a design contest |
Set |
|
Procurement of supplies quoted and purchased on a commodity market |
Set |
|
Purchase of supplies or services on particularly advantageous terms |
||
from a supplier which is definitively winding up its business activities |
Set |
|
from the liquidator in an insolvency procedure, an arrangement with creditors or a similar procedure under national laws and regulations |
Set |
|
Unlabeled |
Map to |
|
D1.2 |
Other justification for the award of the contract without prior publication of a call for competition in the Official Journal of the European Union |
|
The procurement falls outside the scope of application of the directive |
Set |
|
D1.3 |
Explanation |
|
Please explain in a clear and comprehensive manner why the award of the contract without prior publication in the Official Journal of the European Union is lawful, by stating the relevant facts and, as appropriate, the conclusions of law in accordance with the directive (500 words maximum) |
Map to |
Annex D2 – Utilities¶
Index | Label and XPath | OCDS guidance |
---|---|---|
Justification for the award of the contract without prior publication of a call for competition in the Official Journal of the European Union |
||
Directive 2014/25/EU (please select the relevant option and provide an explanation) |
||
D2.1 |
Justification for the choice of the negotiated procedure without prior publication of a call for competition in accordance with Article 50 of Directive 2014/25/EU |
For each of the following, add a |
No tenders or no suitable tenders / requests to participate in response to a procedure with prior call for competition |
Set |
|
The contract involved is purely for the purpose of research, experiment, study or development under the conditions stated in the directive |
Set |
|
The works, supplies or services can be provided only by a particular economic operator for the following reason |
||
absence of competition for technical reasons |
Set |
|
procurement aiming at the creation or acquisition of a unique work of art or artistic performance |
Set |
|
protection of exclusive rights, including intellectual property rights |
Set |
|
Extreme urgency brought about by events unforeseeable for the contracting entity and in accordance with the strict conditions stated in the directive |
Set |
|
Additional deliveries by the original supplier ordered under the strict conditions stated in the directive |
Set |
|
New works / services, constituting a repetition of existing works / services and ordered in accordance with the strict conditions stated in the directive |
Set |
|
Service contract to be awarded to the winner or one of winners under the rules of a design contest |
Set |
|
Procurement of supplies quoted and purchased on a commodity market |
Set |
|
Purchase of supplies or services on particularly advantageous terms |
||
from a supplier which is definitively winding up its business activities |
Set |
|
from the liquidator in an insolvency procedure, an arrangement with creditors or a similar procedure under national laws and regulations |
Set |
|
Bargain purchase taking advantage of a particularly advantageous opportunity available for a very short time at a price considerably lower than market prices |
Set |
|
Unlabeled |
Map to |
|
Unlabeled |
Set |
|
D2.2 |
Other justification for the award of the contract without prior publication of a call for competition in the Official Journal of the European Union |
|
The procurement falls outside the scope of application of the directive |
Same as The procurement falls outside the scope of application of the directive above Set |
|
D2.3 |
Explanation |
|
Please explain in a clear and comprehensive manner why the award of the contract without prior publication in the Official Journal of the European Union is lawful, by stating the relevant facts and, as appropriate, the conclusions of law in accordance with the directive (500 words maximum) |
Map to |
Annex D3 – Defence and security¶
Index | Label and XPath | OCDS guidance |
---|---|---|
Justification for the award of the contract without prior publication of a call for competition in the Official Journal of the European Union |
||
Directive 2009/81/EC (please select the relevant option and provide an explanation) |
||
D3.1 |
Justification for the choice of the negotiated procedure without publication of a call for competition in accordance with Article 28 of Directive 2009/81/EC |
For each of the following, add a |
No tenders or no suitable tenders / requests to participate in response to |
||
restricted procedure |
Set |
|
negotiated procedure with prior publication of a contract notice |
Set |
|
competitive dialogue |
Set |
|
The contract concerns research and development services other than those referred to in Article 13 of Directive 2009/81/EC (for services and supplies only) |
Set |
|
The products involved are manufactured purely for the purpose of research, experiment, study or development under the conditions stated in the directive (for services and supplies only) |
Set |
|
All tenders submitted in reply to a restricted procedure, negotiated procedure with prior publication of a contract notice or competitive dialogue were irregular or unacceptable. Only those tenderers were included in the negotiations which have satisfied the qualitative selection criteria |
Set |
|
The works, supplies or services can be provided only by a particular economic operator for the following reason |
||
absence of competition for technical reasons |
Set |
|
protection of exclusive rights, including intellectual property rights |
Set |
|
The periods for the restricted procedure and the negotiated procedure with prior publication of a contract notice are incompatible with the urgency resulting from a crisis |
Set |
|
Extreme urgency brought about by events unforeseeable by the contracting authority / entity and in accordance with the strict conditions stated in the directive |
Set |
|
Additional deliveries by the original supplier ordered under the strict conditions stated in the directive |
Set |
|
New works / services, constituting a repetition of existing works / services and ordered in accordance with the strict conditions stated in the directive |
Set |
|
Procurement of supplies quoted and purchased on a commodity market |
Set |
|
Purchase of supplies or services on particularly advantageous terms |
||
from a supplier which is definitively winding up its business activities |
Set |
|
from the liquidator in an insolvency procedure, an arrangement with creditors or a similar procedure under national laws and regulations |
Set |
|
Contract related to the provision of air and maritime transport services for the armed forces of a Member State deployed or to be deployed abroad, under the strict conditions stated in the directive |
Set |
|
Unlabeled |
Map to |
|
D3.2 |
Other justification for the award of the contract without prior publication of a call for competition in the Official Journal of the European Union |
|
The contract has as its object services listed in Annex II B to the directive |
Set |
|
Unlabeled |
Set |
|
Unlabeled |
Map to |
|
The procurement falls outside the scope of application of the directive |
Same as The procurement falls outside the scope of application of the directive above Set |
|
D3.3 |
Explanation |
|
Please explain in a clear and comprehensive manner why the award of the contract without prior publication in the Official Journal of the European Union is lawful, by stating the relevant facts and, as appropriate, the conclusions of law in accordance with the directive (500 words maximum) |
Map to |
Annex D4 – Concession¶
Index | Label and XPath | OCDS guidance |
---|---|---|
Justification for the award of the concession without prior publication of a concession notice in the Official Journal of the European Union |
||
Directive 2014/23/EU (please select the relevant option and provide an explanation) |
||
D4.1 |
Justification for the award of the concession without publication of a concession notice in accordance with Article 31(4) and (5) of Directive 2014/23/EU |
For each of the following, add a |
No applications, no tenders or no suitable tenders/applications in response to a prior concession award procedure |
Set |
|
The works or services can be provided only by a particular economic operator for the following reason |
||
concession aiming at the creation or acquisition of a unique work of art or artistic performance |
Set |
|
absence of competition for technical reasons |
Set |
|
existence of an exclusive right |
Set |
|
protection of intellectual property rights and exclusive rights other than those defined in point (10) of Article 5 of the directive |
Set |
|
Unlabeled |
Map to |
|
Unlabeled |
Set |
|
Unlabeled |
Map to |
|
D4.2 |
Other justification for the award of the concession without prior publication of a concession notice in the Official Journal of the European Union |
|
The procurement falls outside the scope of application of the directive |
Same as The procurement falls outside the scope of application of the directive above Set |
|
D4.3 |
Explanation |
|
Please explain in a clear and comprehensive manner why the award of the contract without prior publication in the Official Journal of the European Union is lawful, by stating the relevant facts and, as appropriate, the conclusions of law in accordance with the directive (500 words maximum) |
Map to |